swimgasil.blogg.se

Inboard monolith
Inboard monolith









inboard monolith
  1. #INBOARD MONOLITH INSTALL#
  2. #INBOARD MONOLITH PRO#
  3. #INBOARD MONOLITH PLUS#
  4. #INBOARD MONOLITH WINDOWS#

This wall can also be constructed with the layer of plywood on the interior in place of the smart vapour retarder, with no sheathing between the outboard side of the structural wall and the wood fiber insulation.

#INBOARD MONOLITH PRO#

Pro Clima Mento 1000 airtight monolithic WRB (secondary airtightness, weather protection), taped airtight.Option to increase thickness to 4 3/4″ with no lead time increase, or other sizes with increased lead time. 2 3/8″ (60mm) wood fiberboard tongue and groove insulation board (thermal bridge-free continuous insulation layer), R-8.5.2×6, 2×8, or 2×10 framed structural wall on 16” or 24″ centers, with densepack cellulose, R-20, R-27, or R-34.

#INBOARD MONOLITH PLUS#

  • Pro Clima Intello Plus airtight reinforced smart vapour retarder (primary air and vapour control layer, holds cellulose).
  • 1 ½” (2×4 on the flat in the shop) or 3 ½” (2×4 on edge, by others on-site) (strapping for services, typically uninsulated, but optional to insulate on site, optional), R-6 or R-14.
  • With a smart vapour retarder on the interior, the vapour control strategy can be more suitable to challenging climates. This wall requires a more complex installation due to the lesser ease of fastening through bottom and top plates with structural screws, but can provide a less thick overall wall dimension and an R-value more reasonable for more temperate climates. An optional 1 ½” service cavity can be installed in the shop, or installed on site by others if the depth requirement is greater. The Gutex wall uses a “closed” structural wall (2×6, 2×8, or 2×10) filled in the shop with densepack cellulose insulation and has a smart vapor retarder on the interior, a layer of plywood on the exterior, and a layer of wood fiberboard insulation outboard, followed by an airtight, vapor open, monolithic housewrap and a layer of ¾” to 1 ½” strapping. All window rough openings are prepared with cedar sill shims and a peel and stick sill pan treatment.

    #INBOARD MONOLITH WINDOWS#

    ¾” plywood bucks and approved headers and additional structure for windows and doors are always installed in the shop, integrated into airtight layers, and included in CC wall packages.

    #INBOARD MONOLITH INSTALL#

    While our wall panels are designed with windows, exterior finishes, interior services, and interior finishes in mind, these items are not included in Collective Carpentry wall panels and are installed on site by others, with the exception of windows and doors which are sometimes installed on site by the CC install team, on a case by case basis. 3/4″ – 1 1/2″ vertical rainscreen strapping (& optional ¾” to 1 ½” horizontal rainscreen strapping).Pro Clima Mento 1000 airtight monolithic WRB (secondary airtightness, weather protection) / Pro Clima Mento Plus airtight reinforced monolithic WRB (to hold cellulose), taped airtight.5/8″ Agepan DWD wood fiber insulation board (optional, to hold cellulose), R-1.14.9 1/2″, 11 7/8″, 14” or 16” I-joists, with densepack cellulose (thermal bridge-free continuous insulation layer), R-35, R-44, R-52, or R-59.1/2″ or 5/8″ plywood, taped airtight (primary air and vapour control layer, and for racking strength).2×4 or 2×6 framed structural wall on 16” or 24″ centers (batt insulation optional, on-site, and by others, R-14 or R-22).This wall is efficient to build, and typically only marginally more expensive than our Gutex wall panels for a much higher R-value. In this wall, the structure sits on the outside edge of the building’s footprint, while the I-joist is an “outrigger” that hangs outward from the building. The I-joist wall uses an open framed structural wall followed by an airtight (seams taped) plywood layer and a cavity of densepacked cellulose encapsulated by 9 ½”, 11 ⅞”, 14”, or 16” I-joists, and finished with a ⅝” layer of wood fiberboard insulation, an airtight, monolithic, vapor open housewrap, and a layer of ¾” to 1 ½” rainscreen strapping.











    Inboard monolith